Operation CHARM: Car repair manuals for everyone.

Charge Air Cooler And Hoses - Installation






INSTALLATION










1. Position the charge air cooler (2). Install the bolts (1) and tighten to 2 Nm (17 in. lbs.) torque.
2. Install the air intake system tubes (4) to the charge air cooler (2). With the clamps in position, tighten the clamps to 11 Nm (95 in. lbs.) torque.
3. Install the transmission auxiliary cooler (if equipped) Air To Oil Cooler - Installation
4. Install the A/C condenser (if A/C equipped) A/C Condenser - Installation. Recharge A/C system Refrigerant System Charge.
5. Connect the battery negative cables.
6. Start engine and check for boost system leaks.
7. Install the front grille assembly Grille - Installation.