A/C and Heater Control - Installation
INSTALLATION
NOTE: Typical A/C-heater control shown.
1. Position the A/C-heater control (2) onto the back of the instrument panel center bezel (1).
2. Install the four screws (3) that secure the A/C-heater control to the center bezel. Tighten the screws to 2.2 Nm (20 in. lbs.).
3. Connect the wire harness connectors (4 and 5) to the back of the A/C-heater control and install the instrument panel center bezel Instrument Panel Bezel - Installation.
4. Reconnect the negative battery cable.
5. Initiate the Actuator Calibration function using a scan tool HVAC System Test.