| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Diagnose/Test |
| System, Diagnosis | 0.7 | 0.6 | B | |
| Replace |
| Complete Assembly Without Transfer Of Parts | 11.2 | 0.0 | B | Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment. |
| Complete Assembly With Transfer Of Parts | 13.7 | 9.5 | B | Includes: Transfer All Fuel & Electrical Units. Does Not Include Transfer Of Optional Equipment. |
| Short Block | 21.2 | 15.0 | A | Includes: R&I Engine, Transfer All Necessary Components, Grind Valves & Tune-Up. |
| NOTE |
| To R&R Bare Cylinder Head, Add |
| One Bank | 1.9 | 1.6 | A | |
| Both Banks | 3.8 | 3.2 | A | |
| To R&R Complete Cylinder Head, Add |
| One Bank | 0.6 | 0.5 | A | |
| Both Banks | 1.2 | 1.0 | A | |
| To Grind Valves, Add | 6.2 | 5.2 | A | |
| Long Block | 18.2 | 0.0 | B | Includes: R&I Engine, Transfer All Necessary Components. |
| Overhaul/Rebuild | 31.2 | 0.0 | A | Includes: Disassemble & Clean Engine, Ridge Ream & Hone Cylinders. Fit Pistons, Rings, Pins, Main & Rod Bearings. Grind Valves & Tune-Up |