Operation CHARM: Car repair manuals for everyone.

Crankshaft Installation

Crankshaft Installation

Special Tools Required
^ Handle Driver 07749-0010000
^ Attachment, 24 x 26 mm 07746-0010700
^ Oil seal driver attachment 96 07ZAD-PNAA100

1. M/T model: Install the crankshaft end bushing when replacing the crankshaft. Using the handle driver and attachment, drive in the crankshaft end bushing until the driver and attachment bottom against the crankshaft.





2. Check the connecting rod bearing clearance with plastigage.
3. Check the main bearing clearance with plastigage.
4. Install the bearing halves in the engine block and connecting rods.
5. Apply a coat of new engine oil to the main bearings and rod bearings.
6. Hold the crankshaft so rod journal No. 2 and rod journal No. 3 are straight up, then lower the crankshaft into the engine block.
7. Apply new engine oil to the thrust washer surfaces. Install the thrust washers (A) in the No. 4 journal of the engine block.





8. Inspect the connecting rod bolts.
9. Apply new engine oil to the threads of the connecting rod bolts.
10. Seat the rod journals into connecting rod No. 1 and connecting rod No. 4. Line up the mark (B) on the connecting rod and cap, then install the caps and bolts finger-tight.
11. Rotate the crankshaft clockwise, and seat the journals into connecting rod No. 2 and connecting rod No. 3. Line up the mark on the connecting rod and cap, then install the caps and bolts finger-tight.
12. Torque the connecting rod bolts to 20 Nm (2.0 kgf-m, 15 lbf-ft).
13. Torque the connecting rod bolts an additional 90°.

NOTE: Remove the connecting rod bolt if you torqued it beyond the specified angle, then go back to step 8 of the procedure. Do not loosen it back to the specified angle.





14. Remove all of the old liquid gasket from the lower block mating surfaces, bolts, and bolt holes.
15. Clean and dry the lower block mating surfaces.
16. Apply liquid gasket, P/N 08717-0004, 08718-0001, 08718-0003, or 08718-0009, evenly to the engine block mating surface of the lower block and to the inner threads of the bolt holes. Install the component within 5 minutes of applying the liquid gasket.

NOTE:
^ If you apply liquid gasket P/N 08718-0012, the component must be installed within 4 minutes.
^ If too much time has passed after applying the liquid gasket, remove the old liquid gasket and residue, then reapply new liquid gasket.





17. Put the lower block on the engine block.
18. Apply new engine oil to the bearing cap bolts. Torque the bearing cap bolts in sequence to 30 Nm (3.0 kgf-m, 22 lbf-ft).





19. Torque the bearing cap bolts an additional 56°.





20. Torque the 8 mm bolts in sequence to 22 Nm (2.2 kgf-m, 16 lbf-ft).





21. Use the handle driver and oil seal driver attachment to drive a new crankshaft oil seal squarely into the engine block to the specified installed height.





22. Measure the distance between the engine block (A) and crankshaft oil seal (B).





23. Install the baffle plates.





24. Install the oil pump.
25. Install the oil pan.
26. Install the cylinder head.
27. M/T model: Install the flywheel, clutch disc, and pressure plate.
28. A/T model: Install the drive plate.
29. Install the transmission.
30. Install the engine/transmission.

NOTE: Whenever any crankshaft or connecting rod bearing is replaced, it is necessary after reassembly to run the engine at idling speed until it reaches normal operating temperature, then continue to run it for about 15 minutes.