Gauge Control Module Replacement
Gauge Control Module ReplacementNOTE: Before replacing the gauge control module, do the "Rewriting the ODO Data and the Transferring the Maintenance Minder on a New Gauge Control Module".
1. Remove the instrument panel.
2. Remove the screws from the gauge control module (A), and spread a protective cloth (B) on the upper column cover.
3. Disconnect the connectors (C), and remove the gauge control module.
4. Install the gauge in the reverse order of removal.