Water Passage Replacement
Water Passage Replacement
1. Do the battery removal procedure. Removal and Replacement
2. Drain the engine coolant. Testing and Inspection
3. Remove the upper radiator hose (A) and the lower radiator hose (B), then disconnect engine coolant temperature (ECT) sensor 1 connector (C) and the exhaust gas recirculation (EGR) valve connector (D).
4. Remove the harness holder mounting bolt (A), then remove the harness holder (B) from the bracket.
5. Remove the water bypass hoses (A) and the heater hoses (B).
6. Remove the EGR pipe.
7. Remove the water passage and related parts.
8. Install the water passage in the reverse order of the removal.
9. Do the battery installation procedure. Removal and Replacement
10. Refill the radiator with engine coolant, and bleed the air from the cooling system with the heater valve open. Service and Repair
11. Clean up any spilled engine coolant.