Operation CHARM: Car repair manuals for everyone.

Battery Visual Inspection - 1




1. CHECKING FLOW

Part 1:




Part 2:




2. CHECKING SHEET

3. LOAD TEST
1. When discharging the battery during 15 seconds at half currency of Cold Cranking Power (CCP), the voltage of the battery should be as shown below.






2. When the voltage is not within specification, repeat the load test again, and re-charge.
3. If the battery is left alone for 2 hours after recharging and its output is over 12.5V, and the voltage after a load test is over the standard value, the battery can be used.