Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Variable Valve Timing Actuator: Service and Repair





Inspection

1. Turn the ignition switch OFF.
2. Disconnect the OCV connector.
3. Measure resistance between the OCV terminals 1 and 2.
4. Check that the resistance is within the specification.

Specification:Refer to "Specification"

Removal

[CVVT Oil Control Valve (Intake)]
1. Turn ignition switch OFF and disconnect the negative (-) battery cable.
2. Remove the intake manifold .
3. Disconnect the CVVT oil control valve connector (A).




4. Remove the mounting bolt (B), and then remove the valve from the engine.

[CVVT Oil Control Valve (Exhaust)]
1. Turn ignition switch OFF and disconnect the negative (-) battery cable.
2. Disconnect the CVVT oil control valve connector (A).




3. Remove the cylinder head cover .
4. Remove the mounting bolt (A), and then remove the valve from the engine.






Installation

1. Installation is reverse of removal.

CVVT oil control valve installation bolt:
9.8 - 11.8 N.m (1.0 - 1.2 kgf.m, 7.2 - 8.7 lbf.ft)

CAUTION:
Pay attention to color of valve connector (Component and harness side) when installing. If an OCV is installed on opposite bank, the engine may be damaged.

[Connector Color]