Solar Sensor: Testing and Inspection
COMPONENT INSPECTIONSunload Sensor
Measure voltage between auto amp. harness connector M119 terminal 12 (SB) and ground.
If NG, replace sunload sensor.
- When checking sunload sensor, select a place where sun shines directly on it.