Reprogramming and Section Information
Part 3: Reprogram ABS/VDC Control Unit with 8 MB (orange) Reprogramming CardCAUTION:
^ Perform this operation in five (5) sections. DO NOT SKIP any of these sections.
^ The sections must be performed in order 1 through 5.
Section 1: Connect a battery charger and CONSULT-II to the vehicle.
Section 2: Check all systems in "SELF-DIAG" RESULTS and erase any DTC(s).
Section 3: Confirm the vehicle battery voltage and CONSULT-II Charger Input.
Section 4: Perform ABS/VDC Control Unit Reprogramming.
Section 5: Again perform a check of all systems in "SELF-DIAG" RESULTS and erase any newly stored DTC(s).