Operation CHARM: Car repair manuals for everyone.

Inspection





VACUUM LINES


Inspection


INSPECTION AFTER REMOVAL

Appearance
Check for correct assembly, damage and deterioration.

Check Valve Airtightness
- Use a handy vacuum pump (A) to check.






When connected to the booster side (B):
Vacuum should decrease within 1.3 kPa (9.8 mmHg, 0.38 inHg) for 15 seconds under a vacuum of -66.7 kPa (-500 mmHg, -19.69 inHg).
When connected to the engine side (C):
Vacuum should not exist.

- Replace vacuum hose assembly if vacuum hose and check valve are malfunctioning.