Special Repair Requirement
INSPECTION AND ADJUSTMENT
ADDITIONAL SERVICE WHEN REPLACING CONTROL UNIT : Special Repair Requirement
1.LASER BEAM AIMING ADJUSTMENT
Adjust laser beam aiming. Refer to Outline of Laser Beam Aiming Adjustment Procedure.
>> GO TO 2
2.ICC SYSTEM ACTION TEST
1. Perform the ICC system operation test. Refer to Action Test.
2. Check that the ICC system operates normally.
>> INSPECTION END.