Operation CHARM: Car repair manuals for everyone.

Charging System Preliminary Inspection





CHARGING SYSTEM PRELIMINARY INSPECTION


Inspection Procedure

1.CHECK BATTERY TERMINALS CONNECTION
Check if battery terminals are clean and tight.
Is the inspection result normal?
YES - GO TO 2.
NO - Repair battery terminals connection.
2.CHECK FUSE
Check for blown fuse and fusible link.





Is the inspection result normal?
YES - GO TO 3.
NO - Be sure to eliminate cause of malfunction before installing new fuse or fusible link.
3.CHECK GENERATOR GROUND TERMINAL CONNECTION
Verify connector E206 terminal 5 (generator ground harness) is clean and tight.
Is the inspection result normal?
YES - GO TO 4.
NO - Repair connection.
4.CHECK DRIVE BELT TENSION
Check drive belt tension. Procedures.
Is the inspection result normal?
YES - Inspection End.
NO - Repair as needed.