Connecting Rod: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| One CYL | ||||
| One Bank | 8.4 | 0.0 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |
| Both Banks | 10.2 | 0.0 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |
| All Cyls | 11.9 | 0.0 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |
| Add Following Operations If Performed With Piston & Ring Jobs. | 0.2 | 0.0 | A | |
| Tune Up | 0.9 | 0.0 | A |