Transmission Control Systems: Tools and Equipment
REQUIRED TOOLS AND EQUIPMENT- DRBIII (diagnostic read-out box) - DRBIII must use the latest release level.
- Transmission Simulator (Miller # 8333)
- Jumper wires
- Test Light
- 0hmmeter
- Voltmeter
- Pressure gauge (0-300 PSI)