Installation
INSTALLATION
1. Position the blower motor relay (2) into the proper receptacle of the power distribution center (PDC) (1).
2. Align the blower motor relay terminals with the terminal cavities in the PDC receptacle and push down firmly on the relay until the terminals are fully seated.
3. Close the cover of the PDC.
4. Reconnect the negative battery cable.