A/C And Heater Control - Installation
INSTALLATION
NOTE: Take the proper precautions to protect the face of the A/C-heater control, center bezel and the instrument panel switch pod from cosmetic damage while performing this procedure.
1. Position the A/C-heater control (1) into the instrument panel center bezel (3).
2. Install the four screws (2 and 4) that secure the A/C-heater control to the center bezel. Tighten the screws to 2 Nm (17 in. lbs.).
3. Install the instrument panel center bezel Instrument Panel Center Bezel - Installation.
4. Reconnect the negative battery cable.
5. Initiate the Actuator Calibration function using a scan tool Testing and Inspection.