Daytime Running Lamp Control Unit: Testing and Inspection





Inspection

1. The daytime running unit is integrated in the BCM (A).




2. Check that the light operate according to the following timing chart.
(1) If Alt 'L' is High, DRL control put in operation.
(2) If Head Lamp Low Relay is turned ON or Head Lamp High Switch is turned ON during DRL control operating, DRL control is cancelled.




3. If the daytime running light is not operated well, Inspect the connector and terminals to be sure they are all making good contact.
If the terminals are bent, loose or corroded, repair them as necessary, and recheck the system.
If the terminals look OK, go to step 4.
4. Make these input tests at the connector by using ETM.
If any test indicates a problem, find and correct the cause, then recheck the system.
If all the input tests prove OK, the I/P (Instrument panel) junction box must be faulty; replace it.