Power Transistor HVAC: Testing and Inspection
INSPECTION
INSPECT POWER TRANSISTOR OPERATION
a. Connect the positive (+) lead from the battery to terminal 1 through a 3.4 W test bulb and terminal 3 of a 120 Ohms resistor.
b. Connect the negative (-) lead from the battery to terminal 2 and check that the test bulb lights up.
If