Operation CHARM: Car repair manuals for everyone.

Power Transistor HVAC: Testing and Inspection


INSPECTION





INSPECT POWER TRANSISTOR OPERATION

a. Connect the positive (+) lead from the battery to terminal 1 through a 3.4 W test bulb and terminal 3 of a 120 Ohms resistor.
b. Connect the negative (-) lead from the battery to terminal 2 and check that the test bulb lights up.
If