Operation CHARM: Car repair manuals for everyone.

Installation








2UZ-FE COOLING: RADIATOR:

INSTALLATION

1. INSTALL RADIATOR ASSEMBLY






(a) Insert the tabs of the radiator support through the radiator service holes.
(b) Install the radiator assembly with the 4 bolts.
Torque: 18 Nm (184 kgf-cm, 13 ft-lbf)
2. INSTALL FAN SHROUD






(a) Insert the tabs in the slots shown in the illustration, attach the fan shroud with the 2 bolts.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
3. INSTALL RADIATOR RESERVE TANK ASSEMBLY
(a) Install the reserve tank with the 3 bolts.
Torque: 5.0 Nm (51 kgf-cm, 44 in-lbf)
(b) Connect the reserve tank hose to the radiator.
4. INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
5. ADD ENGINE COOLANT Service and Repair

6. INSPECT ENGINE COOLANT LEAK On-Vehicle Inspection