Manuals through 2025 now available!
Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.
LEMON is the spiritual successor to CHARM, I recommend you try it!
Link:
lemon-manuals.la or
lemon-manuals.org.ua
(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)
Or, hide this message:
temporarily or
permanently
Power Distribution Relay: Testing and Inspection
2UZ-FE STARTING: ACC CUT RELAY:INSPECTION 1.
INSPECT ACC CUT RELAY
(a)
Continuity inspection.
(1)
Using an ohmmeter, check for continuity between each terminal.
Standard: (2)
Using an ohmmeter, check for continuity between terminals 3 and 5 when voltage is applied across terminals 1 and 2.
Specified condition: Continuity