Installation
2UZ-FE ENGINE CONTROL SYSTEM: THROTTLE BODY:
INSTALLATION
1. INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY
(a) Install a new gasket and the throttle body with the 3 bolts and nut.
Torque: 14 Nm (143 kgf-cm, 10 ft-lbf)
(b) Connect the water by-pass hose, water by-pass hose No. 7 and throttle position sensor connector.
2. INSTALL AIR CLEANER HOSE ASSEMBLY
3. ADD ENGINE COOLANT Service and Repair
4. CHECK FOR ENGINE COOLANT LEAKS On-Vehicle Inspection
5. INSTALL V-BANK COVER SUB-ASSEMBLY
(a) Install the V-bank cover sub-assembly with the 2 nuts.
Torque: 7.5 Nm (80 kgf-cm, 66 in-lbf)