Installation
A750F AUTOMATIC TRANSMISSION: AIR COOLED OIL COOLER:
INSTALLATION
1. INSTALL OIL COOLER ASSEMBLY
(a) Install the oil cooler assembly, bolt and 4 bolts.
Torque: 5.0 Nm (51 kgf-cm, 40 in-lbf)
(b) Install the transmission oil cooler hose No. 1 and clip.
(c) Install the oil cooler sub tube.
(d) Install the oil cooler hose and clip.
2. ADD AUTOMATIC TRANSMISSION FLUID
HINT: Procedures
3. INSPECT AUTOMATIC TRANSMISSION FLUID
HINT: Procedures