Installation
2GR-FE EMISSION CONTROL: VACUUM SWITCHING VALVE: INSTALLATION
INSTALLATION
1. INSTALL VACUUM SWITCHING VALVE ASSEMBLY
(a) Install the vacuum switching valve assembly with the bolt.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
(b) Connect the 2 vacuum hoses and vacuum switching valve connector.
2. INSTALL V-BANK COVER SUB-ASSEMBLY Installation