Operation CHARM: Car repair manuals for everyone.

Installation








U151F AUTOMATIC TRANSAXLE: PARK / NEUTRAL POSITION SWITCH: INSTALLATION

INSTALLATION

1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY






(a) Install the park/neutral position switch to the manual valve shaft.
(b) Temporarily install the 2 bolts.






(c) Place a new lock plate and tighten the nut.
Torque: 6.9 Nm (70 kgf-cm, 61 in-lbf)
(d) Temporarily install the control shaft lever.






(e) Turn the lever counterclockwise until it stops and then turn it clockwise 2 notches.
(f) Remove the control shaft lever.






(g) Align the groove with the neutral basic line.
(h) Hold the switch in position and tighten the 2 bolts.
Torque: 5.4 Nm (55 kgf-cm, 48 in-lbf)






(i) Using a screwdriver, bend the tabs of the lock plate.






(j) Install the control shaft lever, washer and the nut.
Torque: 13 Nm (130 kgf-cm, 9 ft-lbf)






(k) Connect the park/neutral position switch connector.
2. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY






(a) Connect the control cable to the control shaft lever with the nut.
Torque: 15 Nm (153 kgf-cm, 11 ft-lbf)






(b) Install the control cable to the bracket with a new clip.
3. ADJUST PARK/NEUTRAL POSITION SWITCH ASSEMBLY Adjustments

4. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY OPERATION Testing and Inspection

5. INSPECT SHIFT LEVER POSITION

6. ADJUST SHIFT LEVER POSITION

7. INSTALL AIR CLEANER BRACKET

8. INSTALL INTAKE AIR RESONATOR SUB-ASSEMBLY

9. INSTALL NO. 1 AIR CLEANER INLET

10. INSTALL AIR CLEANER CASE SUB-ASSEMBLY

11. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

12. INSTALL NO. 2 AIR CLEANER INLET

13. INSTALL BATTERY

14. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
HINT: Some systems need initialization after reconnecting the cable to the negative battery terminal. Repair Instruction - Initialization