Installation
U151F AUTOMATIC TRANSAXLE: PARK / NEUTRAL POSITION SWITCH: INSTALLATION
INSTALLATION
1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
(a) Install the park/neutral position switch to the manual valve shaft.
(b) Temporarily install the 2 bolts.
(c) Place a new lock plate and tighten the nut.
Torque: 6.9 Nm (70 kgf-cm, 61 in-lbf)
(d) Temporarily install the control shaft lever.
(e) Turn the lever counterclockwise until it stops and then turn it clockwise 2 notches.
(f) Remove the control shaft lever.
(g) Align the groove with the neutral basic line.
(h) Hold the switch in position and tighten the 2 bolts.
Torque: 5.4 Nm (55 kgf-cm, 48 in-lbf)
(i) Using a screwdriver, bend the tabs of the lock plate.
(j) Install the control shaft lever, washer and the nut.
Torque: 13 Nm (130 kgf-cm, 9 ft-lbf)
(k) Connect the park/neutral position switch connector.
2. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
(a) Connect the control cable to the control shaft lever with the nut.
Torque: 15 Nm (153 kgf-cm, 11 ft-lbf)
(b) Install the control cable to the bracket with a new clip.
3. ADJUST PARK/NEUTRAL POSITION SWITCH ASSEMBLY Adjustments
4. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY OPERATION Testing and Inspection
5. INSPECT SHIFT LEVER POSITION
6. ADJUST SHIFT LEVER POSITION
7. INSTALL AIR CLEANER BRACKET
8. INSTALL INTAKE AIR RESONATOR SUB-ASSEMBLY
9. INSTALL NO. 1 AIR CLEANER INLET
10. INSTALL AIR CLEANER CASE SUB-ASSEMBLY
11. INSTALL AIR CLEANER CAP SUB-ASSEMBLY
12. INSTALL NO. 2 AIR CLEANER INLET
13. INSTALL BATTERY
14. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
HINT: Some systems need initialization after reconnecting the cable to the negative battery terminal. Repair Instruction - Initialization