Operation CHARM: Car repair manuals for everyone.

Installation








2GR-FE STARTING: STARTER: INSTALLATION

INSTALLATION

1. INSTALL STARTER ASSEMBLY






(a) Install the starter assembly with the 2 bolts.
Torque: 37 Nm (380 kgf-cm, 28 ft-lbf)
(b) Connect the wire harness to terminal 30 and install the nut, and then attach the terminal cap.
Torque: 9.8 Nm (100 kgf-cm, 87 in-lbf)
(c) Connect the terminal 50 connector to the starter assembly.
2. INSTALL NO. 1 AIR CLEANER INLET

3. INSTALL AIR CLEANER CASE SUB-ASSEMBLY

4. INSTALL AIR CLEANER CAP SUB-ASSEMBLY

5. INSTALL NO. 2 AIR CLEANER INLET

6. INSTALL V-BANK COVER SUB-ASSEMBLY

7. INSTALL COOL AIR INTAKE DUCT SEAL

8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

9. PERFORM INITIALIZATION Repair Instruction - Initialization
(a) Perform initialization procedure .
HINT: Some vehicle systems require initialization after reconnecting the cable to the negative battery terminal.