Installation
2GR-FE STARTING: STARTER: INSTALLATION
INSTALLATION
1. INSTALL STARTER ASSEMBLY
(a) Install the starter assembly with the 2 bolts.
Torque: 37 Nm (380 kgf-cm, 28 ft-lbf)
(b) Connect the wire harness to terminal 30 and install the nut, and then attach the terminal cap.
Torque: 9.8 Nm (100 kgf-cm, 87 in-lbf)
(c) Connect the terminal 50 connector to the starter assembly.
2. INSTALL NO. 1 AIR CLEANER INLET
3. INSTALL AIR CLEANER CASE SUB-ASSEMBLY
4. INSTALL AIR CLEANER CAP SUB-ASSEMBLY
5. INSTALL NO. 2 AIR CLEANER INLET
6. INSTALL V-BANK COVER SUB-ASSEMBLY
7. INSTALL COOL AIR INTAKE DUCT SEAL
8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
9. PERFORM INITIALIZATION Repair Instruction - Initialization
(a) Perform initialization procedure .
HINT: Some vehicle systems require initialization after reconnecting the cable to the negative battery terminal.