Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la
If it fails: lemon-manuals.org.ua

Or, hide this message: temporarily or permanently

Installation








2GR-FE EMISSION CONTROL: VACUUM SWITCHING VALVE: INSTALLATION

INSTALLATION

1. INSTALL VACUUM SWITCHING VALVE ASSEMBLY






(a) Install the vacuum switching valve assembly with the bolt.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)






(b) Connect the 2 vacuum hoses and vacuum switching valve connector.
2. INSTALL V-BANK COVER SUB-ASSEMBLY Installation