Removal
2UZ-FE STARTING: STARTER: REMOVAL
REMOVAL
1. DISCHARGE FUEL SYSTEM PRESSURE
HINT: Service Precautions
2. DRAIN ENGINE COOLANT Service and Repair
3. DISCONNECT BATTERY NEGATIVE TERMINAL
(a) Disconnect the battery negative terminal.
4. REMOVE V-BANK COVER SUB-ASSEMBLY
(a) Remove the 2 nuts and V-bank cover sub-assembly.
5. REMOVE AIR CLEANER HOSE ASSEMBLY Removal
6. DISCONNECT FUEL HOSE Removal
7. DISCONNECT NO. 2 FUEL HOSE Removal
8. DISCONNECT FUEL VAPOR FEED HOSE ASSEMBLY
(a) Disconnect the fuel vapor feed hose assembly.
9. SEPARATE ENGINE WIRE
(a) Disconnect the 8 fuel injector connectors.
(b) Disconnect the throttle position sensor connector.
(c) Disconnect the water temperature sensor connector.
(d) Remove the 3 bolts and separate the engine wire harness.
10. DISCONNECT NO. 7 WATER BY-PASS HOSE
(a) Disconnect the No. 7 water by-pass hose.
11. DISCONNECT WATER BY-PASS HOSE
(a) Disconnect the water by-pass hose.
12. REMOVE INTAKE MANIFOLD ASSEMBLY
(a) Remove the 6 bolts and 4 nuts.
(b) Remove the intake manifold and 2 gaskets.
13. REMOVE WATER BY-PASS PIPE SUB-ASSEMBLY
(a) Separate the No. 2 engine wire.
(b) Remove the nut and water by-pass pipe sub-assembly.
14. REMOVE REAR WATER BY-PASS JOINT RH
(a) Remove the 4 nuts, water by-pass joint and 2 gaskets.
15. REMOVE AIR PUMP ASSEMBLY WITH BRACKET Removal
16. REMOVE STARTER ASSEMBLY
(a) Disconnect the starter connector.
(b) Remove the nut and disconnect the starter cable.
(c) Remove the bolt and disconnect the engine wire protector.
(d) Remove the 2 bolts and starter.