Instrument Cluster / Carrier: Testing and Inspection
METER: LIGHT CONTROL RHEOSTAT: INSPECTION
INSPECTION
1. INSPECT LIGHT CONTROL RHEOSTAT
(a) Measure the resistance according to the value(s) in the table below.
Standard resistance:
HINT:
If the value is not as specified, replace the light control rheostat.