Operation CHARM: Car repair manuals for everyone.

Installation








U151E AUTOMATIC TRANSAXLE: TRANSMISSION WIRE: INSTALLATION

INSTALLATION

1. INSTALL TRANSMISSION WIRE





(a) Coat a new O-ring of the transmission wire connector with ATF and install it.





(b) Install the transmission wire with the bolt.
Torque: 5.4 Nm (55 kgf-cm, 48in-lbf)
2. CONNECT TRANSMISSION WIRE





(a) Coat a new O-ring of the ATF temperature sensor with ATF.
(b) Install the ATF temperature sensor with the lock plate and bolt.
Torque: 6.6 Nm (67 kgf-cm, 58in-lbf)
(c) Connect the 7 shift solenoid valve connectors.
3. INSTALL AUTOMATIC TRANSAXLE OIL PAN SUB-ASSEMBLY





(a) Install the 2 magnets in the oil pan.
(b) Apply adhesive to the 18 bolts.
Adhesive:
Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent





(c) Using a new gasket, install the oil pan to the transaxle case with the 18 bolts.
Torque: 7.8 Nm (80 kgf-cm, 69in-lbf)
NOTICE:
Apply adhesive to the bolts and tighten them within 10 minutes of application.

4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
5. ADD AUTOMATIC TRANSAXLE FLUID
6. INSPECT AUTOMATIC TRANSAXLE FLUID U151F Automatic Transaxle
7. INSTALL NO. 2 ENGINE UNDER COVER (w/ No. 2 engine under cover)
8. INSTALL NO. 1 ENGINE UNDER COVER
9. INSTALL ENGINE UNDER COVER ASSEMBLY (w/ engine under cover assembly)
10. RESET MEMORY
HINT:
U151F Automatic Transaxle System

11. PERFORM INITIALIZATION
HINT: Some systems need initialization after reconnecting the cable to the negative battery terminal Repair Instruction - Initialization.