Operation CHARM: Car repair manuals for everyone.
Do you have access to Mitchell1 Prodemand, or eautorepair.net DIY? If you are willing to share user/password (we can pay), please get in contact with us ASAP (truly, it is urgent): email operation-charm [[at]] tuta.io or click to submit anonymously

Installation





2GR-FSE EMISSION CONTROL: PCV VALVE: INSTALLATION

1. INSTALL VENTILATION VALVE





(a) Apply adhesive to 2 or 3 threads.

Adhesive:

Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

(b) Install the ventilation valve.

Torque : 27 Nm (275 kgf-cm, 20 ft-lbf)

2. CONNECT VENTILATION HOSE





(a) Connect the ventilation hose to the ventilation valve.

3. INSTALL V-BANK COVER Installation