Operation CHARM: Car repair manuals for everyone.

Installation





2GR-FXE COOLING: TEMPERATURE SWITCH: INSTALLATION

1. INSTALL TEMPERATURE SWITCH

(a) Using a union nut wrench (19 mm), install a new temperature switch.





Torque : 7.4 Nm (75 kgf-cm, 65 in-lbf)

NOTICE:
Do not apply any excessive force to the cooler pipe when installing the temperature switch.

(b) Connect the temperature switch connector.





2. ADD ENGINE COOLANT (for Engine) Service and Repair

3. INSTALL FRONT FLOOR COVER LH Installation

4. INSPECT FOR COOLANT LEAK (for Engine) Testing and Inspection

5. INSTALL NO. 1 ENGINE UNDER COVER

6. INSTALL V-BANK COVER SUB-ASSEMBLY Installation

7. INSTALL COOL AIR INTAKE DUCT SEAL Installation

8. INSTALL ENGINE ROOM SIDE COVER LH Installation

9. INSTALL ENGINE ROOM SIDE COVER Installation