Purge Flow Sensor: Testing and Inspection
Purge Flow Sensor Pinout:
PURGE FLOW SENSOR (PFS) INSPECTION
1. Disconnect the vacuum hoses from the PFS.
2. Plug the port leading to the evaporative emission canister purge solenoid valve.
3. Apply 13.6 kPa (4.1 in. Hg) to the PFS.
4. Verify that vacuum holds.
5. Measure the resistance between PFS SIG (Pin 2) and PWR GND (Pin 3) on the PFS.
Resistance: 15 ohms
6. Measure the resistance between PFS SIG (Pin 2) and VPWR (Pin 1) on the PFS.
Resistance: 25.65 - 28.35 ohms
7. If vacuum and/or resistance are not as specified, replace the PFS.