Operation CHARM: Car repair manuals for everyone.

Fuel Injection



1. Check engine condition (spark plugs, leaks in hoses, etc.).
2. Turn all electrical loads "OFF."
3. Warm up engine to normal operating temperature.

Test Connector For Tachometer:




Test Connector:





4. Connect tachometer (white check connector) and timing light.
5. Ground test connector (green: 1-pin) with a jumper wire.
6. Check that idle speed is within specification:

750 ± 20 rpm (M/T in neutral)
770 ± 20 rpm (A/T in "P")

Timing Mark:





7. Check that timing marks on crankshaft pulley and timing belt cover are aligned as specified:

5° ± 1° BTDC

Fig. 50 Distributor Adjustment:





8. If ignition timing is not within specification, loosen distributor lock bolt and rotate distributor housing to adjust.
9. Tighten distributor lock bolt to specified torque:

19 - 25 Nm (1.9 - 2.6 mkg, 14 - 19 ftlb)

10. After adjustment, disconnect jumper wire from test connector.