Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Control Module: Testing and Inspection

SOLENOID TRANSISTOR INSPECTION

1. Disconnect control unit connectors.
2. Check continuity between terminals 2K, 2M, 2N, 2O, 2P and 2S.
3. If there is no continuity at any one terminal, replace EC-AT control unit.

TERMINAL VOLTAGE INSPECTION

1. With ignition switch "ON," check EC-AT control unit terminal voltages, referring to terminal voltage chart.
2. If not correct, check and replace or repair defective component(s) and/or wiring.
3. If voltages are not correct and no other cause is detected, replace control unit.

TERMINAL VOLTAGE CHART

PART 1

EC-AT Control Unit Terminal Voltage Chart (Part 1):






PART 2

EC-AT Control Unit Terminal Voltage Chart (Part 2):