Manuals through 2025 now available!
Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.
LEMON is the spiritual successor to CHARM, I recommend you try it!
Link:
lemon-manuals.la or
lemon-manuals.org.ua
(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)
Or, hide this message:
temporarily or
permanently
Electric Load Sensor: Testing and Inspection
Central Processing Unit (CPU):
1.
Remove control unit and check voltage between terminals of junction box and body ground.
2.
If terminal inspection results are incorrect, refer to inspection chart and check the indicated system.
3.
If terminal inspection results are correct but system does not operate, replace CPU.
TERMINAL INSPECTION CHARTEngine Load Control Unit Testing Chart: