Component Testing/Inspection
INSPECTION1. Remove the Powertrain Control Module (PCM) power relay from the main fuse block.
PCM Power Relay:
2. Apply battery voltage (B+) to terminal 85, then ground terminal 86. Check for continuity between terminals 30 and 87 of the relay.
3. It not as specified, replace the PCM power relay.