Electric Load Sensor: Testing and Inspection
Inspection
1. Remove the central processing unit (CPU) and check the voltage between terminals of joint box and a body ground.
2. If the terminal inspection results are incorrect, refer to the action column and check the indicated system.
3. If the terminal inspection results are correct but system does not operate, replace the CPU.
Terminal Inspection Chart