Operation CHARM
: Car repair manuals for everyone.
Home
>>
Mazda
>>
2000
>>
Millennium Edition V6-2.3L DOHC (Miller cycle)
>>
Repair and Diagnosis
>>
Powertrain Management
>>
Computers and Control Systems
>>
Testing and Inspection
>>
Scan Tool Testing and Procedures
>>
Not Using SST (NGS Tester)
>>
At Battery Power Terminal Inspection
Manuals through 2025 now available!
Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.
LEMON is the spiritual successor to CHARM, I recommend you try it!
Link:
lemon-manuals.la
or
lemon-manuals.org.ua
(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)
Or, hide this message:
temporarily
or
permanently
At Battery Power Terminal Inspection
1.
Disconnect the PCM connector.
2.
Turn the ignition switch to
ON
.
3.
Measure the voltage between battery power terminal and ground.
-
If it is not normal, repair the related harnesses.
Specification: B+