Operation CHARM: Car repair manuals for everyone.
Manuals through 2025 now available!

Our trusted friends have launched a new website named LEMON, which has newer manuals. It also contains all the CHARM manuals.

LEMON is the spiritual successor to CHARM, I recommend you try it!

Link: lemon-manuals.la or lemon-manuals.org.ua

(Some people have issue connecting. LEMON is investigating. For now, use Firefox or change your DNS server)

Or, hide this message: temporarily or permanently

Connecting Rod: Testing and Inspection

CONNECTING ROD INSPECTION

Caution
- The piston, piston ring and connecting rod cannot be disassembled.
- When replacing the piston, piston pin, piston ring and connecting rod, replace them together as a single unit.

1. Install the connecting rod cap.





2. Measure the connecting rod large end side clearance.
- If it exceeds the specification, replace the piston, piston pin, piston ring and connecting rod as a single unit.
Standard clearance 0.14 - 0.36 mm {0.0056 - 0.0141 inch}
Maximum clearance 0.435 mm {0.0172 inch}
3. Remove the connecting rod cap.
4. Position plastigauge atop the journals in the axial direction.
5. Install the connecting rod bearing and connecting rod cap.
6. Remove the connecting rod cap.





7. Measure the connecting rod oil clearance.
- If it exceeds the specification, replace the connecting rod bearing or grind the crank pin and use oversize bearings so that the specified clearance is obtained.





Standard clearance 0.026 - 0.052 mm {0.0011 - 0.0020 inch}
Maximum clearance 0.10 mm {0.0039 inch}

BOLT INSPECTION
1. Measure the length of each bolt.
- If it exceeds the specification, replace the bolt.








Length L