SOLENOID VALVE REMOVAL/INSTALLATION (SECONDARY CONTROL VALVE BODY) [FS5A-EL]
1. Remove the battery cover.
2. Disconnect the negative battery cable.
3. Remove the battery duct.
4. Remove the battery, battery box and battery tray.
5. Remove the under cover.
6. Drain the ATF
7. Remove the oil cover.
8. Remove the secondary control valve body.





9. Remove the bracket.





10. Remove the solenoid valve(s).
11. Apply ATF to a new O-ring and install it on the solenoid valve.
12. Install the solenoid valve in the secondary control valve body.
Tightening torque 7.8-10.8 N-m (80-110 kgf-cm, 70-95.4 in-lbf)
13. Install the secondary control valve body.
14. Install the oil cover.
15. Install the under cover.
16. Install the battery, battery box and battery tray.
17. Install the battery duct.
18. Connect the negative battery cable.
19. Install the battery cover.
20. Add ATF.
21. Perform the mechanical system test. (See MECHANICAL SYSTEM TEST [FS5A-EL].) Mechanical System Test