Assembly Procedure
Assembly procedure1. Measure the spring free length.
Primary control valve body spring (standard)
^ If not as specified, replace the springs.
2. Install the 3-4 shift valve, 3-4 shift valve spring, and retainer.
3. Install the bypass valve, bypass valve spring, and retainer.
4. Install the torque converter clutch control valve, torque converter clutch control valve spring, and retainer.
5. Install the converter relief valve, converter relief valve spring, and retainer.
6. Install the solenoid shift valve, solenoid shift valve spring, and retainer.
7. Install the pressure regulator valve, pressure regulator valve spring, and retainer.