Evaporative Emission Control Canister: Testing and Inspection
CHARCOAL CANISTER INSPECTION [L3 WITH TC]
1. Remove the charcoal canister. (See Service and Repair.)
2. Plug ports A and C, then blow air into port B.
CAUTION:
- Do not apply the pressure more than 20 kPa {0.2 kgf/cm2, 2.9 psi} to the charcoal canister. Doing so will damage the charcoal canister.
3. Verify that there is no air leakage from the case.
- If not as specified, replace the charcoal canister. (See Service and Repair.)