SCR SYSTEM INSPECTION [SKYACTIV-D 2.2]
id0116e1808000
Operation After Replacing Urea Tank
1. If the urea tank is replaced, perform the following procedure.
- (1) Perform urea tank initialization procedure. (See UREA TANK INITIALIZATION [SKYACTIV-D 2.2].)
-
- (2) Refill AdBlue®. (See AdBlue® REPLACEMENT [SKYACTIV-D 2.2].)
-
- (3) Wait for 120 s.
-
- (4) Connect the M-MDS to the DLC-2.
-
- (5) After the vehicle is identified, select the following items from the initial screen of the M-MDS.
-
- 1) Select the “Powertrain”.
-
- 2) Select the “SCRCU”.
-
- 3) Select the “SCR function”.
-
- 4) Select the “Reset for urea tank level”.
-
- 5) Select the “SCR First Filling”.
-
- 6) Select the “SCR Pressure Preparation”.
-
- 7) Select the “SCR Leak detection Test”.
-
-
The test result
-
Before: 4400—8600 hPa
After: 4400—8600 hPa
- 8) Select the “SCR Emptying”.
-
- 9) Select the “SCR Dosing Quaritity Test from tester”.
-
-
Inputed values
-
dosing quantity (g) : 10 g
dosing mass flow (mg/s) : 30 mg/s
-
The test result
-
dosing quantity (g) : 9—11 g
dosing mass flow (mg/s) : 26—34 mg/s
- 10) Verify that the SCR warning light in the instrument cluster is not turned on.
-
Operation After Replacing Urea Pump
1. If the urea Pump is replaced, perform the following procedure.
- (1) Perform urea pump initialization procedure. (See UREA PUMP INITIALIZATION [SKYACTIV-D 2.2].)
-
- (2) Wait for 120 s.
-
- (3) Connect the M-MDS to the DLC-2.
-
- (4) After the vehicle is identified, select the following items from the initial screen of the M-MDS.
-
- 1) Select the “Powertrain”.
-
- 2) Select the “SCRCU”.
-
- 3) Select the “SCR function”.
-
- 4) Select the “SCR First Filling”.
-
- 5) Select the “SCR Pressure Preparation”.
-
- 6) Select the “SCR Leak detection Test”.
-
-
The test result
-
Before: 4400—8600 hPa
After: 4400—8600 hPa
- 7) Select the “SCR Emptying”.
-
- 8) Verify that the SCR warning light in the instrument cluster is not turned on.
-
Operation After Replacing Urea Injector
1. If the urea injector is replaced, perform the following procedure.
- (1) Perform urea injector initialization procedure. (See UREA INJECTOR INITIALIZATION [SKYACTIV-D 2.2].)
-
- (2) Connect the M-MDS to the DLC-2.
-
- (3) After the vehicle is identified, select the following items from the initial screen of the M-MDS.
-
- 1) Select the “Powertrain”.
-
- 2) Select the “SCRCU”.
-
- 3) Select the “SCR function”.
-
- 4) Select the “SCR Dosing valve dry actuation test”.
-
-
The test result
-
The number of valve test : 10
The number of successful : 8 or more
- 5) Select the “SCR Pressure Preparation”.
-
- 6) Select the “SCR Dosing Quantity Test from tester”.
-
-
Inputed values
-
dosing quantity (g) : 10 g
dosing mass flow (mg/s) : 30 mg/s
-
The test result
-
dosing quantity (g) : 9—11 g
dosing mass flow (mg/s) : 26—34 mg/s
- 7) Select the “SCR Spray Test”.
-
-
The test result
-
dosing quantity (g) : 0.036—0.044 g
dosing mass flow (mg/s) : 3.8—5.0 mg/s
- 8) Select the “SCR Emptying”.
-
- 9) Verify that the SCR warning light in the instrument cluster is not turned on.
-
Operation After Replacing Dosing Control Unit
1. If the Dosing Control Unit is replaced, perform the following procedure.
- (1) Perform Dosing Control Unit initialization procedure. (See DOSING CONTROL UNIT INITIALIZATION [SKYACTIV-D 2.2].)
-
- (2) Perform compulsory diesel particulate filter regeneration. (See COMPULSORY DIESEL PARTICULATE FILTER REGENERATION [SKYACTIV-D 2.2].)
-
- (3) Connect the M-MDS to the DLC-2.
-
- (4) After the vehicle is identified, select the following items from the initial screen of the M-MDS.
-
- 1) Select the “Powertrain”.
-
- 2) Select the “SCRCU”.
-
- 3) Select the “SCR function”.
-
- 4) Select the “SCR Dosing valve dry actuation test”.
-
-
The test result
-
The number of valve test : 10
The number of successful : 8 or more
- 5) Select the “Reset for urea tank level”.
-
- 6) Select the “SCR First Filling”.
-
- 7) Select the “SCR Pressure Preparation”.
-
- 8) Select the “SCR Emptying”.
-
- 9) Select the “SCR Dosing Quaritity Test from tester”.
-
-
Inputed values
-
dosing quantity (g) : 10 g
dosing mass flow (mg/s) : 30 mg/s
-
The test result
-
dosing quantity (g) : 9—11 g
dosing mass flow (mg/s) : 26—34 mg/s
- 10) Verify that the SCR warning light in the instrument cluster is not turned on.
-
Operation After Replacing SCR system pressure line
1. If the SCR system pressure line is replaced, perform the following procedure.
- (1) Perform SCR system pressure line initialization procedure. (See SCR SYSTEM PRESSURE LINE INITIALIZATION [SKYACTIV-D 2.2].)
-
- (2) Connect the M-MDS to the DLC-2.
-
- (3) After the vehicle is identified, select the following items from the initial screen of the M-MDS.
-
- 1) Select the “Powertrain”.
-
- 2) Select the “SCRCU”.
-
- 3) Select the “SCR function”.
-
- 4) Select the “SCR Pressure Preparation”.
-
- 5) Select the “SCR Leak detection Test”.
-
-
The test result
-
Before: 4400—8600 hPa
After: 4400—8600 hPa
- 6) Select the “SCR Emptying”.
-
- 7) Select the “SCR Dosing Quaritity Test from tester”.
-
-
Inputed values
-
dosing quantity (g) : 10 g
dosing mass flow (mg/s) : 30 mg/s
-
The test result
-
dosing quantity (g) : 9—11 g
dosing mass flow (mg/s) : 26—34 mg/s
- 8) Verify that the SCR warning light in the instrument cluster is not turned on.
-
Operation After Replacing SCR System Wiring Harness
1. If the SCR system wiring harness is replaced, perform the following procedure.
- (1) Perform SCR system wiring harness initialization procedure. (See SCR SYSTEM WIRING HARNESS INITIALIZATION [SKYACTIV-D 2.2].)
-
- (2) Connect the M-MDS to the DLC-2.
-
- (3) After the vehicle is identified, select the following items from the initial screen of the M-MDS.
-
- 1) Select the “Powertrain”.
-
- 2) Select the “SCRCU”.
-
- 3) Select the “SCR function”.
-
- 4) Select the “SCR Dosing valve dry actuation test”.
-
-
The test result
-
The number of valve test : 10
The number of successful : 8 or more
- 5) Select the “SCR Pressure Preparation”.
-
- 6) Select the “SCR Emptying”.
-
- 7) Select the “SCR Dosing Quaritity Test from tester”.
-
-
Inputed values
-
dosing quantity (g) : 10 g
dosing mass flow (mg/s) : 30 mg/s
-
The test result
-
dosing quantity (g) : 9—11 g
dosing mass flow (mg/s) : 26—34 mg/s
- 8) Verify that the SCR warning light in the instrument cluster is not turned on.
-