POWER BRAKE UNIT VACUUM SENSOR INSPECTION [WITHOUT CYLINDER DEACTIVATION (SKYACTIV-G 2.0, SKYACTIV-G 2.5)]
id0140m1889400
Function Inspection
1. Connect the M-MDS to the DLC-2.
2. Switch the ignition ON (engine off).
3. Display the PID BBP. (See OBD ON-BOARD SYSTEM READINESS TEST [PCM (WITHOUT CYLINDER DEACTIVATION (SKYACTIV-G 2.0, SKYACTIV-G 2.5))].) (See PCM INSPECTION [WITHOUT CYLINDER DEACTIVATION (SKYACTIV-G 2.0, SKYACTIV-G 2.5)].)
4. Compare the voltage and power brake unit vacuum indications for the PID BBP with the standard in the table indicated below.
Standard
BBP |
|
---|---|
V |
kPa {kgf/cm2, psi} |
Approx. 0.29
|
7.54 {0.0769, 1.09}
|
Approx. 3.81
|
96.7 {0.986, 14.0}
|
Voltage Inspection
1. Connect the M-MDS to the DLC-2.
2. Switch the ignition ON (engine off).
3. Verify that the power brake unit vacuum sensor output voltage (PID: BBP) is within the specification. (See OBD ON-BOARD SYSTEM READINESS TEST [PCM (WITHOUT CYLINDER DEACTIVATION (SKYACTIV-G 2.0, SKYACTIV-G 2.5))].) (See PCM INSPECTION [WITHOUT CYLINDER DEACTIVATION (SKYACTIV-G 2.0, SKYACTIV-G 2.5)].)
Specification
ac5wzw00009761
|