POWER STEERING PRESSURE (PSP) SWITCH INSPECTION [L8, LF]


id0140i7803100

Note
• Before performing the following inspection, make sure to follow the procedure as indicated in the troubleshooting flowchart. (See Troubleshooting Procedure.)

Continuity Inspection

1. Inspect the following items:

• Power steering fluid amount (See POWER STEERING FLUID INSPECTION.)
• Power steering-related inspection (See STEERING LOCATION INDEX.)

2. Disconnect the PSP switch connector.

3. Start the engine.

4. Verify that the continuity between PSP switch terminal A and body ground is as indicated in the table.

• If not as indicated in the table, replace the PSP switch. (See POWER STEERING OIL PUMP DISASSEMBLY/ASSEMBLY.)
• If the monitor item condition/specification (reference) is not within the specification, even though there is no malfunction, perform the "Circuit Open/Short Inspection".

Circuit Open/Short Inspection

1. Disconnect the PCM connector. (See PCM REMOVAL/INSTALLATION [L8, LF].)

2. Inspect the following wiring harness for open or short circuit (continuity Inspection).

Open circuit

• If there is no continuity, there is an open circuit. Repair or replace the wiring harness.
- PSP switch terminal A and PCM terminal 2T

Short circuit

• If there is continuity, there is a short circuit. Repair or replace the wiring harness.
- PSP switch terminal A and body ground