OIL CONTROL VALVE (OCV) INSPECTION [L3 Turbo]
id0110b3801400
Coil Resistance Inspection
1. Remove the battery cover. (See BATTERY REMOVAL/INSTALLATION [L3 Turbo].)
2. Disconnect the negative battery cable.
3. Disconnect the OCV connector.
4. Measure the coil resistance between terminals A and B using a tester.
am3zzw00003523
|
5. Install in the reverse order of removal.
Spool Valve Operation Inspection
1. Remove the OCV. (See OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [L3 Turbo].)
2. Verify that the spool valve in the OCV is in the maximum valve timing retard position as shown in the figure.
am3uuw00006062
|
3. Verify that the battery is fully charged. (See BATTERY INSPECTION [L3 Turbo].)
4. Apply battery positive voltage between the OCV terminals and verify that the spool valve operates and moves to the maximum valve timing advance position.
am3uuw00006063
|
am3zzw00003523
|
5. Stop applying battery positive voltage and verify that the spool valve returns to the maximum valve timing retard position.
6. Install the OCV. (See OIL CONTROL VALVE (OCV) REMOVAL/INSTALLATION [L3 Turbo].)