COOLANT RESERVE TANK REMOVAL/INSTALLATION [MZR-CD 2.2]
id0112f3801000
1. Remove the aerodynamic under cover No.2. (See AERODYNAMIC UNDER COVER NO.2 REMOVAL/INSTALLATION.)
2. Drain the engine coolant until the coolant reserve tank becomes empty. (See ENGINE COOLANT REPLACEMENT [MZR-CD 2.2].)
3. Remove in the order indicated in the table.
4. Install in the reverse order of removal.
5. Refill the engine coolant. (See ENGINE COOLANT REPLACEMENT [MZR-CD 2.2].)
6. Inspect for engine coolant leakage. (See ENGINE COOLANT LEAKAGE INSPECTION [MZR-CD 2.2].)
am3zzw00006326
|
1
|
Hose
|
2
|
Coolant reserve tank
|