CHECK VALVE INSPECTION[L3 Turbo]
id0116b4801400
1. Remove the charge air cooler cover. (See INTAKE AIR SYSTEM REMOVAL/INSTALLATION[L3 Turbo].)
2. Disconnect the vacuum hose connected between the check valve and the purge solenoid valve from the purge solenoid valve.
3. Disconnect the vacuum hose connected between the check valve and the intake manifold from the intake manifold.
4. Blow through the check valve and verify that air flows as specified.
acxuuw00000214
|
Specification
Condition |
Airflow |
---|---|
Air applied from port A to B
|
Yes
|
Air applied from port B to A
|
No*
|